Strood Flood Strategy Strood is at risk of tidal flooding from the River Medway as well as significant surface water flood risks. Medway Council Contract summary Industry Flood-prevention works – 45246400 Location of contract South East Value of contract £0 Procurement reference MEDWAY001-DN491519-49686393 Published date 6 August 2020 Closing date 28 August 2020 Closing time 12pm Contract start date 14 September 2020 Contract end date 31 May 2021 Contract type Works Procedure type Open procedure Contract is suitable for SMEs? Yes Contract is suitable for VCSEs? Yes Description Strood is located in Medway, Kent on the east of the
The post Strood Flood Strategy appeared first on Government Online.